During Your Solar Installation FAQs

Q. How long will the installation take?

Our installations normally take 2-3 days. Some companies will claim that they can complete an installation in one day but we don’t cut corners and ensure all the work is to the highest possible standard. We prefer to test the performance of our solar PV systems during daylight hours which might not be easy if the installation is completed in the late afternoon.

Q. Will my electricity be disconnected?

Our solar electrician will have to turn off your electricity for a short period of time (typically around 30 minutes) to make the final connections.

Q. Will there be much disruption in my home?

There will be some drilling throughout the day but the installation doesn’t make much mess. There is a small amount of packaging, most of which can be recycled.

Back to FAQ index page.

Medoria Solar Limited, 1a Station Lane, Thorpe, Wakefield, West Yorks, WF3 3DJ   T: 07723 334791   E: 

Solar Panels in Wakefield | Solar Panels in Yorkshire | Wakefield Solar Installer | Solar Power in Leeds | Solar Energy in Wakefield

Powered by WordPress. Web design by Wingfinger Graphics, Leeds

Medoria Solar ContactUnpacking solar panels on siteSolar panel installation

Medoria Solar is approved by

NAPIT logo MCS logo RECC logo