Before Your Solar Installation FAQs

Q. Do I need planning permission?

Our roof mounted systems do not need planning permission unless the property is a listed building or in a conservation area. We will provide advice and relevant documentation about this.

Q. Will my roof be strong enough?

Most roofs are strong enough to take a solar installation without any reinforcement. We will assess this during the survey process and perform windload calculations to ensure the integrity of the building structure.

Q. What will happen before the installation date?

We will agree an installation date with you in writing. A few days before this date, in most cases, we will arrange for scaffolding to be erected to enable easy access to the rooftop. We will also purchase the components on your behalf.

Back to FAQ index page.

Medoria Solar Limited, 1a Station Lane, Thorpe, Wakefield, West Yorks, WF3 3DJ   T: 07723 334791   E: 

Solar Panels in Wakefield | Solar Panels in Yorkshire | Wakefield Solar Installer | Solar Power in Leeds | Solar Energy in Wakefield

Powered by WordPress. Web design by Wingfinger Graphics, Leeds

Medoria Solar ContactSolar Panels fitted to a domestic roof in WakefieldJoists

Medoria Solar is approved by

NAPIT logo MCS logo RECC logo